On July 28, 2022, the IVACE Presidency issued a resolution approving the granting of reimbursable aid (subsidized loan/non-refundable grant) “Call for Resolution of April 1, 2022, from the President of the Valencian Institute of Business Competitiveness (IVACE), by which aid is called for the promotion of self-consumption facilities for electricity in the municipalities of the Valencian Community, charged to the budget for the year 2022”. On November 19, 2022, the General Director of IVACE has issued a complementary resolution in accordance with the provisions of article 9 of the aforementioned call, setting the final and definitive amount of the subsidized loan and the non-refundable aid granted, and whose data is indicate below.
Objectives: It is about the installation of an electrical energy generation system using photovoltaic technology as a renewable energy source, whose objective is energy self-consumption, thus reducing its annual electricity bill, achieving significant energy savings due to the use of the sun as a source. of energy.
Results: Below is the comparison between invoices for April (no more available with the installation carried out) of the present annuity and a previous annuity.
Billed
period
|
Peak
energy
(Kwh)
|
Flat
energy
(Kwh)
|
Valley
energy
(Kwh)
|
Total
energy
(Kwh)
|
April 2021
|
622,00
|
1.365,00
|
1.018,00
|
3.005,00
|
April 2023
|
204,74
|
124,45
|
462,52
|
791,71
|
In the Technical Report presented, the solar production for April was estimated at 1,952.71, while in reality 2,213.2 is being saved, higher than expected. Therefore, in the month of April, 260.49 kWh would have been poured into the network, with its consequent economic savings. All of the above is consistent and is consistent with and interpolated to the year with which the initial study was carried out, not having more real data due to not having more electricity bills since the installation was completed up to the present.
IVACE File No.: IAAUTF/2022/37
Project: Self-consumption photovoltaic installation with discharge to the network, Calle del Pino, no. 2, ground floor, corner of Calle Almendros, no. 8, Urbanization Ciudad Quesada, Rojales.